Is there any point ...
 
Share:
Notifications
Clear all

UPDATE FROM MABULA

I have had a very rough 2 months unfortunately health wise. I was struck 3x in a row with bacterial infections. The second infection occurred  after a routine hospital checkup and I became very sick. I had to rest and take a lot of antibiotics. Once I was recovering and restarting work 1 month ago, I again became sick. The infection was not yet gone, so even more antibiotics and rest was needed. Needless to say, it took a lot of my energy and I needed a lot of rest.

 

Finally, the infection is really gone and my energy is coming back step-by-step now and I have started work again. I am terribly sorry to have kept you waiting for support. I will address all outstanding questions and e-mails step-by step and will be on the forum daily from today.

 

APP 2.0.0-beta47 will come soon as well, a lot of work was already completed before I became very ill, so the release is also nearly ready for you. Beta47 will be much faster actually. Many workflows will be more than 2x faster, mosaics can even be 10x faster than before because registration really received a major boost... all compared to beta46.  Before I release it, I will make sure that everything is working properly and then I will release it.

Is there any point to saving normalised files?

2 Posts
2 Users
0 Reactions
1,595 Views
(@itarchitectkev)
Neutron Star
Joined: 9 years ago
Posts: 122
Topic starter  

Hi, I had a large process running that led to running out of memory on Integration. So I saved the files that had gone through calibration, registration and normalisation - and saved them under the normalise tab.

On loading them again, the tooltip under Other Files says that is where you load calibrated files. However clicking on any action (like Integration) said there are no Lights to process.

So I loaded them as Lights, and then it tried to go through Star Analysis and Registration, and failed on Registration.

What gives? If I have a failure on Integration that forces me to close down APP and re-process, what is the most efficient way of doing this?

Thanks!



   
ReplyQuote
(@phfenain)
Main Sequence Star
Joined: 7 years ago
Posts: 26
 

Following.



   
ReplyQuote
Share: